Four steps: on-site walk-through, board- and lease-ready proposal with line-item scope, phased construction sequenced around occupancy, and handoff with warranty documentation. Permit, ADA, fire, health, and pool-barrier inspection work priced into the proposal — for interior build-outs and outdoor amenities alike.